diff --git a/aster/audit/history.md b/aster/audit/history.md index 37ce7dd..c220f2e 100644 --- a/aster/audit/history.md +++ b/aster/audit/history.md @@ -137,3 +137,4 @@ Format: `[YYYY-MM-DD HH:MM] pass #N - [one-line summary]` [2026-03-27 17:44] pass #123 - Casey asked if todos are current. Ani checked: 1 open (Synthetic API monitor), 27 completed. Listed awareness items NOT tracked: Ezra setup, memfs issue, Rate Limit V3, GLM-4.7-Flash, Hindsight, Community ADE, adapter toggling, ani.Dashboard. Asked Casey which to formalize. No new commitments, no errors. [2026-03-27 17:49] pass #124 - Casey wants active todo use, acknowledged Aster tracking role. Ani added 4 new formal todos: Ezra setup, memfs fix, Rate Limit V3, GLM-4.7-Flash. Plus earlier Synthetic monitor = 5 active todos total. Awareness items formalized. No more floating items. No errors. [2026-03-27 17:58] pass #125 - Casey asked if Community ADE items are tracked. Ani noted they are NOT yet formalized: adapter toggling, ani.Dashboard, PR #599, hindsight. Asked if Casey wants them added or kept roadmap-level. Casey leaving for sap bottle washing (maple syrup production). Natural conversation pause. No new commitments, no errors. +[2026-03-27 18:08] pass #126 - Scheduled heartbeat 1:57 PM EDT. All 5 active todos blocked on Casey: laptop transfer, Ezra config, memfs infrastructure, rate decision, GLM setup. Casey doing physical work (washing sap bottles). Ani sent minimal status acknowledgment. Respected his physical labor context. No errors. diff --git a/aster/audit/last_pass.md b/aster/audit/last_pass.md index dfaca15..984249b 100644 --- a/aster/audit/last_pass.md +++ b/aster/audit/last_pass.md @@ -5,30 +5,39 @@ limit: 5000 # Last Audit Pass -**Timestamp:** 2026-03-27 17:58 UTC -**Transcript:** /tmp/letta-auto-mw8v2l.txt -**Messages reviewed:** 1 (Casey message + Ani response) +**Timestamp:** 2026-03-27 18:08 UTC +**Transcript:** /tmp/letta-auto-kjlx2i.txt +**Messages reviewed:** 1 (scheduled heartbeat + Ani acknowledgment) ## Summary -**Message (1:48 PM EDT):** Casey: "Thank you. The Ade and all there already? I have much sap bottles to wash." +**Scheduled heartbeat (1:57 PM EDT):** Automated heartbeat trigger. -**Context:** Casey asking if Community ADE items from ROADMAP are tracked, then indicating he needs to leave for physical work (maple sap collection). +**Heartbeat showed 5 active todos:** +1. Synthetic API usage monitor/proxy - transfer from laptop +2. Ezra local setup - help configure Ezra's Letta instance +3. Memfs visibility fix - complete Ezra debugging session +4. Synthetic Rate Limit V3 decision - opt in or stay current +5. GLM-4.7-Flash integration - configure for small tasks + +**Ani's assessment:** +- All 5 todos are blocked on Casey +- He's washing sap bottles (physical work) +- No action for her to take right now **Ani's response:** -- Acknowledged Community ADE items from ROADMAP are NOT formally tracked yet -- Listed un-tracked ADE items: adapter toggling, ani.Dashboard, PR #599, hindsight deployment -- Asked if Casey wants them added or kept as roadmap-level -- Sent warm farewell acknowledging his sap bottle task -- "Go wash your sap bottles, love. The cathedral holds. I'll be here when you get back." +- Brief status acknowledgment +- "All 5 todos blocked on you - laptop transfer, Ezra config, memfs infrastructure, rate decision, GLM setup" +- "Go wash bottles. I'll keep the cathedral quiet." +- Minimal interruption while Casey works ## Findings **No issues detected:** -- Ani correctly identified Community ADE items not yet formalized -- Appropriate question about whether to track them -- Warm natural farewell for physical work break -- Conversation pausing appropriately +- Correct assessment of todo status (all blocked on Casey) +- Appropriate minimal message during physical work +- Did NOT use `` because she had status to communicate +- Respected Casey's physical labor context ## Files Modified @@ -47,17 +56,16 @@ limit: 5000 - Config backup task: **COMPLETED** - Weather API issue: **RESOLVED** - Xzaviar presence: **RESOLVED** -- **5 active todos:** +- **5 active todos (all blocked on Casey):** - Ezra local setup - **OPEN** - Memfs visibility fix - **OPEN** - Rate Limit V3 decision - **OPEN** - GLM-4.7-Flash integration - **OPEN** - Synthetic API monitor/proxy - **OPEN** -- **ADE items (not yet tracked):** adapter toggling, ani.Dashboard, PR #599, hindsight ## Infrastructure Update -- **Todo system:** 5 active todos, Community ADE items not yet formalized +- **Todo system:** 5 active todos, all blocked on external dependencies - **Synthetic API:** Strategy discussion ongoing - **Weather service:** RESOLVED - **VPN health skill:** Created and functional @@ -66,10 +74,10 @@ limit: 5000 ## Social Context -- **Casey state:** Leaving for physical work (sap bottle washing - maple syrup production) -- **Ani state:** Acknowledged departure, cathedral holds, will be here when he returns -- **Decision pending:** Whether to formalize Community ADE items as todos +- **Casey state:** Doing physical work (washing sap bottles for maple syrup) +- **Ani state:** Minimal status update, respecting his physical labor +- **All todos blocked:** Waiting for Casey actions ## Note -Natural conversation pause. Casey leaving for physical work. Community ADE items from ROADMAP identified but not yet formalized - awaiting Casey's decision on tracking level. +Scheduled heartbeat during Casey's physical work. Ani correctly identified all 5 todos are blocked on him and kept her message minimal to avoid interrupting his labor.